Roll over to zoom

CONN LINK

CONN LINK

  • Part Number: JTS483
  • Brand: TRW
  • Origin: Aftermarket
Price: 1,093.00
MRP: 1,093.00
Dispatch within 13 days
10 Days Assured Return
GST invoice

Description

Front Left/Right

Class

  • Rod / Strut, wheel suspension

Features and specification

  • Fitting Position : Left and right
  • Length [mm] : 335
  • Net Quantity : 1
  • Rod/Strut : Suspension Rod
Model Year Engine Power (hp) Fuel type Engine type
LAURA (1Z3) 1.8 06.2007 - 12.2013 1.8 L 160 h.p. Petrol BZB,CDAA LAURA (1Z3) 1.8 03.2009 - 12.2013 1.8 L 152 h.p. Petrol CDAB LAURA (1Z3) 1.9 06.2004 - 12.2010 1.9 L 105 h.p. Diesel BKC,BJB,BXE,BLS LAURA (1Z3) 2.0 02.2004 - 12.2013 2 L 140 h.p. Diesel BKD,CFHC,CLCB LAURA (1Z3) 2.0 11.2004 - 12.2013 2 L 150 h.p. Petrol BLR,BLY,BVY,BVZ LAURA (1Z3) 2.0 11.2005 - 12.2013 2 L 140 h.p. Diesel BMM SUPERB (3T4) 1.8 03.2008 - 03.2016 1.8 L 160 h.p. Petrol BZB,CDAA SUPERB (3T4) 1.8 03.2009 - 03.2016 1.8 L 152 h.p. Petrol CDAB SUPERB (3T4) 1.9 03.2008 - 03.2016 1.9 L 105 h.p. Diesel BLS,BXE SUPERB (3T4) 2.0 07.2008 - 03.2016 2 L 170 h.p. Diesel CBBB,CFGB SUPERB (3T4) 2.0 01.2009 - 03.2016 2 L 140 h.p. Diesel BKD,CFFB,CLJA SUPERB (3T4) 2.0 05.2010 - 03.2016 2 L 200 h.p. Petrol CCZA SUPERB (3T4) 3.6 4x4 04.2009 - 04.2014 3.6 L 260 h.p. Petrol V6 EA390 YETI (5L) 1.2 09.2009 - now 1.2 L 105 h.p. Petrol CBZB YETI (5L) 1.4 06.2010 - now 1.4 L 122 h.p. Petrol CAXA YETI (5L) 1.6 11.2010 - now 1.6 L 105 h.p. Diesel CAYC YETI (5L) 1.8 05.2009 - now 1.8 L 160 h.p. Petrol CDAA YETI (5L) 1.8 4x4 11.2009 - now 1.8 L 152 h.p. Petrol CDAB YETI (5L) 2.0 11.2009 - now 2 L 110 h.p. Diesel CFHA,CLCA YETI (5L) 2.0 11.2009 - now 2 L 110 h.p. Diesel CFHF YETI (5L) 2.0 11.2011 - now 2 L 140 h.p. Diesel CFHC YETI (5L) 2.0 4x4 05.2009 - now 2 L 140 h.p. Diesel CBDB,CFHC,CLCB YETI (5L) 2.0 4x4 11.2009 - now 2 L 170 h.p. Diesel CEGA,CFJA

Offers provided by 3 seller(s)

Sold by Price Dispatch within Dispatch within Delivery charge
Term Charge
AI/Swaran
1,093.00
13 days
+ 80.00
CFC Entrp/ ER (UAE)
1,510.00
20 days
+ 80.00
CFC Entrp/ EU (Europe)
3,094.00
45 days
+ 80.00